This has been long overdue. We have been working on the actual gearbox construction and easter holidays have started. this is a concept design for the cooling system. Air vents have been added to force air on the motor. the motor itself will be covered by a heatsink so this should keep tempratures low enough to work properly.
After easter break is over i plan to start mounting the power-train and a floor. After which we will begin construction of a body shell.
No comments:
Post a Comment